Osier Way

 

Location

London

Glass Type

Linit 504 (Rough Cast), THST (Toughened + Heat Soak Tested)
Sing, Double and specialised Triple Glazed Arrangements)

ArchitectWaugh Thistleton Architects

Contractor

Bennett Construction

Completion

August 2023

Description

This project is part of the first phase of the Leyton Vision masterplan to redevelop the area west of Leyton Orients football stadium.  The impressive scheme comprises of a family of 5 blocks ranging in 6 to 13 stories.  The Linit U-Profile glass has been excellently used to clad the external lift and stair cores whilst creating a statement feature to the buildings façade, offering either light or privacy as required.