Tower 42 Level 40B

 

Location

London

Fit Out Type

Renovation

Contractor

Datum Construction    

Completion

April 2023

Description               

Tower 42 Level 40B saw the installation of partitions, toilets, sinks, a complete tea point with dishwasher and fridge-freezer, ceilings, sockets and switches, flooring, decorations, lighting fixtures, acoustic panelling, and a brand-new reception desk area as well as the installation of ELV cabling, a smart lighting system, floor boxes throughout and ventilation alterations.