Tower 42 Level 40B

Tower 42 Level 40B

 

Location

London

Fit Out Type

Renovation

Contractor

Datum Construction    

Completion

April 2023

Description               

Tower 42 Level 40B saw the installation of partitions, toilets, sinks, a complete tea point with dishwasher and fridge-freezer, ceilings, sockets and switches, flooring, decorations, lighting fixtures, acoustic panelling, and a brand-new reception desk area as well as the installation of ELV cabling, a smart lighting system, floor boxes throughout and ventilation alterations.