Tower 42 Level 40B | |
Location | London |
Fit Out Type | Renovation |
Contractor | Datum Construction |
Completion | April 2023 |
Description | Tower 42 Level 40B saw the installation of partitions, toilets, sinks, a complete tea point with dishwasher and fridge-freezer, ceilings, sockets and switches, flooring, decorations, lighting fixtures, acoustic panelling, and a brand-new reception desk area as well as the installation of ELV cabling, a smart lighting system, floor boxes throughout and ventilation alterations. |