Eel Pie Island, Twickenham Completion

Design shown for Eel Pie Island utilised Linit U-Profiled Channel Glass

J&C Architectural have recently completed our U-Profiled glazing works on a refurbishment project on Eel Pie Island, brightening up a loft space in an area being used for ensuite facilities.

As part of the renovation, the existing solid stair walls were replaced with Linit Ultra Low Iron U-profiled glazing, designed to channel natural light from both a staircase window and a skylight into the two ensuites below. This innovative use of U-Profiled Glass not only enhances the flow of light throughout the space but also brings a modern aesthetic that complements the contemporary feel of the loft.

The usage of U-profiled glass allows light to permeate through the space without compromising  the privacy of the persons using the ensuites.

The result, shown below gives the space a modern contemporary stylish finish.

Our thanks go to South Derry Construction Limited who as Main Contractor kept the site running smoothly, safely and on programme.

J&C Architectural continues to work with our glass manufacturer Lamberts GmbH to provide Linit glass, manufactured from start to finish in their factory based in Germany, and maintaining an 8-week lead time for fabricated U-Channel glass from order to site.

Do you need U-Channel glass? Contact our team to see how we can help you.

Eel Pie Island, Twickenham

Design shown for Eel Pie Island utilised Linit U-Profiled Channel Glass

We are pleased to have recently completed our U-Channel glazing works to an exquisite and unique property on the picturesque and World Famous Eel Pie Island, on the River Thames, Twickenham.

This four bedroom Edwardian property, accessed only via a footbridge from Twickenham’s recently renovated Embankment, is situated on the closest inhabited Island nearest to the centre of London.

Having recently changed ownership and undergoing extensive renovations and upgrades the client sought some additional light into two upstairs bathrooms. Appropriating light from the staircase Velux window, the solid stair walls are replaced by Linit P23 & P26 Ultra Low Iron, Clarissimo, Toughened and Heat Soak Tested, sandblasted (Matt) units.

Our sincerest thanks go to South Derry Construction Limited who as Main Contractor kept the site running smoothly and safely.

J&C Architectural continues to work with our glass manufacturer Lamberts GmbH to provide Linit glass, manufactured from start to finish in their factory based in Germany, and maintaining an 8-week lead time for fabricated U-Channel glass from order to site.

Do you need U-Channel glass? Contact our team to see how we can help you.