Project Update: Tower 42 Level 12 Leaves A & B

J&C Architectural are proud to confirm we are nearing the completion of another floor of our internal office fitout works at the Tower 42 building (ex-Natwest Tower) in London.

Level 12, Leaves A & B are nearing completion with the final touches to the Managing Director’s Office glazing and snagging remaining in Leaf B. The Tenant is now occupying Leaf A and FF&E installation is in progress for final handover of Level 12 later this week.

If J&C can be of assistance to your next fit out project, please get in touch.

 

Multiple Project Award!!!

J&C Architectural are pleased to announce the award of three U-Channel glazing projects with our new Client LPP Fashion Lab for their new RESERVED brand flagship stores at Westfield Stratford City, Oxford St and Brent Cross. Glass will be onsite in under six weeks from design in order to meet the fast pace of new store fit-out works.

J&C Architectural continues to work with our glass manufacturer Lamberts GmbH to provide Linit glass, manufactured from start to finish in their state of the art factory in Germany and maintaining an 8-week lead time for fabricated U-Channel glass from order to site.

Do you need U-Channel glass? Contact our team to see how we can help you

Level 20, Tower 42, London Completion

J&C Architectural are proud to confirm we have completed and handed over another floor of our internal office fitout works at the Tower 42 building (ex-Natwest Tower) in London.

Level 20 has been completed on programme, under budget and the new tenant is in the process of moving in.

If the J&C team can assist you with any fit-out needs, please contact our office through the link below.

https://j-carchitecturalltd.co.uk/

Attending BAU München 2023

The staff from J&C Architectural Ltd spent a fantastic week at BAU München 2023 with our hosts from Lamberts, meeting clients and discussing the latest innovations in Linit U-Channel glazing. On display were Linit products such as the new Laminated Glass systems (available only from Lamberts), Magico glass, Thermolight Insulation and our new Triple Glazed assembly (achieving a U-value of 1.5 W/m2K).

A special shout out to our colleagues from Linit Korea who were attending the conference for the first time and to the staff from Lamberts who were incredible hosts.

Osier Way, London Update

Osier Way

J&C Architectural Ltd.’s works are ongoing at the Osier Way Project for Bennett Construction (London) Limited, in which 196 affordable residential units and commercial premises are being constructed to the Architects ‘Leach Rhodes Walker’s design.

Our remit is a mix of single and double glazed screens to stair cores 1 & 2 and triple glazed screens to Link blocks C1 & C2.

The chosen glass is a mix of Linit EcoGlass with a roughcast finish in both 8 wire and toughened, with full sandblast & localised partial sandblast areas.

Works are complete to Links C1 & C2 and all areas of the two stair cores leaving only the closure at the hoist openings, which are now in progress.

J&C Architectural continues to work with our glass manufacturer Lamberts GmbH to provide Linit glass, manufactured from start to finish in their factory based in Germany, and maintaining an 8-week lead time for fabricated U-Channel glass from order to site.

Do you need U-Channel glass? Contact our team to see how we can help you.

All available glass types can be viewed on our page dedicated to the Linit U-Channel Glass found here:

https://j-carchitecturalltd.co.uk/linit/

Pinkie St Peter Primary School

J&C Architectural Ltd is proud to have completed works on the Pinkie St Peter Primary school project in Edinburgh. This project involved the installation of two large LINIT U-Channel Glazed screens. These screens were installed in a triple-glazed arrangement, which provides superior insulation and soundproofing properties, making it an ideal choice for a school environment.

Aside from the practical use of LINIT U-Channel Glass, it also gives the Pinkie St Peter Primary school project an elegant, aesthetically pleasing look.

All available glass types can be viewed on our page dedicated to the Linit U-Channel Glass found here:

https://j-carchitecturalltd.co.uk/linit/

University of Sheffield, Update 2

University of Sheffield

Work is progressing well going forward on another of J&C Architectural Ltd.’s latest projects, the University of Sheffield. This project involves the use of the LINIT Double Glazing System, which provides great insulation and soundproofing properties ideal for use in schools and universities.

As can be seen below, we have before and after images of one of the completed rotunda levels demonstrating the dramatic difference that the use of the LINIT Double Glazing System has made to the space. The use of this glazing system has transformed the area into a more visually appealing, functional and comfortable environment for students, faculty and staff.

The University of Sheffield project is yet another example of J&C Architecture’s commitment to delivering innovative and high-quality designs that meet the needs and expectations of their clients. The success of this project is a testament to the expertise and skill of the J&C Architecture team.

Before (on left), After (on right)

Level 20, Tower 42, London Update

Continuing our internal office fitout works at the Tower 42 building (formerly known as the Natwest Tower) in London, we are nearing the finish line for the completion of Level 20 for a new tenant in the building.

Works on this floor were a bespoke design to the new Tenant’s criteria with new ceiling, glass office partitions, flooring and cabinetry.

The final touches are now in progress for the tenant occupation at the end of the month. Another successful project delivery on-time and under budget for our client.

 

 

Eel Pie Island, Twickenham Completion

J&C Architectural have recently completed our U-Channel glazing works on a refurbishment project on Eel Pie Island, brightening up a loft space in an area being used for ensuite facilities.

The existing solid stair walls were replaced by Linit Ultra Low Iron u-channel glazing, to transfer the natural light from a staircase window and skylight into the two ensuites.

The result, shown below, is a contemporary stylish finish.

Our thanks go to South Derry Construction Limited who as Main Contractor kept the site running smoothly, safely and on programme.

J&C Architectural continues to work with our glass manufacturer Lamberts GmbH to provide Linit glass, manufactured from start to finish in their factory based in Germany, and maintaining an 8-week lead time for fabricated U-Channel glass from order to site.

Do you need U-Channel glass? Contact our team to see how we can help you.

Level 40, Tower 42, London Completion

Work has now finished on Level 40 at London’s famous Tower 42 as part of our fit-out works for J&C Building Services division.

The newly completed works included the installation of ELV cabling, a smart lighting system, floor boxes throughout and ventilation alterations.

As well as these the works saw the installation of partitions, toilets, sinks, a complete tea point with dishwasher and fridge-freezer, ceilings, sockets and switches, flooring, decorations, lighting fixtures, acoustic panelling, and a brand-new reception desk area.

Part of our duty was to ensure all of the respective fit out was installed properly and professionally to ensure that all functioned as it should.

This fit-out was undertaken throughout Level 40’s office, lobby and communal areas and provides the spaces with a professional, sophisticated look that is welcoming to employees and clients alike.